- 相关推荐
英文自我鉴定范文
Sandy Lin 15/F,TOWER2 ,BRIGHT CHINA,BUILDING1,BEIJING.
PROFESSIONAL EXPERIENCE
1985-Present LEYNER CORPORATION,Lake Charles,LA
Industrial Engineer
Provide floor support engineering in printed wire assembly (PWA) and subsystem assembly (SSA) areas.
Purchase capital equipment.Interface with vendors. Justify expenditures.
Design plant layout fixtures,and flow charts of material.
Program automatic equipment.
Write process sheets and rework procedures.
Recommend changes to product to allow ease of manufacture.
Implement design changes.Inititate methods and process improvements.
Troubleshoot problems.Effect disposition or rejection of material.
Provide assistance to all other departments.
1984 PRUDENCE D. MCHARRISON LABORATORY,Ruston,LA
Engineering Assistant
Conducted variety of tests including Tensile.Compression,and creep tests on molded parts.
Responsible for production of plastic test specimens,and morentiyishuunting polishing,and microscopic analysis.
Designed tools and fixtures for Instron machine.
1982/83 DUCHESS COMPONENTS,Baton Rouge,LA
Molding Room Attendant,1983
Operated and maintained machine producing epoxy preforms.
Maintained records on inventory,loss of material,and quality control.
Machine shop attendant,1982
Operated lathes,milling and grinding machines;monitored welding and heat treatments.
Read blueprints.[文章来源于 www.unjs.Com]
EDUCATION
LOYOLA UNIVERSITY AT NEW ORLEANS,College of Engineering,New Orleans,LA
Bachelor of Science Degree in Industrial Technology,1985
Minor concentration in computer science.
PROFESSIONAL AFFILIATIONS/CERTIFICATIONS
Member,Society of Manufacturing Engineers,Leaner Management Club Certified Manufacturing Technologist and Solderer.
NOTICE
Relevant Work experience is emphasized while other positions are de-emphasized.
Chronological format illustrates a clear career path.
【英文自我鉴定】相关文章:
英文的说说04-19
英文谚语12-07
女装的英文06-08
英文谚语05-23
给编辑写信英文 给编辑的英文信03-04
英文的评语11-02
英文的句子09-29
英文的签名02-07
经典英文短句09-07
经典英文格言04-28