- 相关推荐
THE SEDIMENTATION AND DREDGING OF GUANTING RESERVOIR
The main tasks of the Guanting Reservoir on the Yongding River were flood control and water supply to Beijing. However, it is not able to supply water due to the serious sedimentation and water pollution in recent years. Of the total original reservoir storage capacity of 2.27×109 m3 (after rebuilt), 0.651×109 m3 in the Yongding Zone is lost due to sedimentation and 0.252×109 m3 in the Guishui Zone cannot be used due to the sand bar at the mouth of the Guishui River. Dredging is performed to deal with the sedimentation of Guanting Reservoir. A dredged channel on the mouth bar between the two parts of the reservoir, i.e. Yongding Zone and Guishui Zone, to resume their connection and a dike to guide most sediment from upstream of the Yongding River to the Guishui Zone are suggested.
作 者: Xiaoqing YANG Shanzheng LI Shiqi ZHANG 作者单位: Xiaoqing YANG,Shiqi ZHANG(China Institute of Water Resources and Hydropower Research,Beijing,100044)Shanzheng LI(Beijing Institute of Hydraulic Research,Beijing,100044)
刊 名: 国际泥沙研究(英文版) SCI 英文刊名: INTERNATIONAL JOURNAL OF SEDIMENT RESEARCH 年,卷(期): 2003 18(2) 分类号: 关键词: Sediment deposition Guanting Reservoir Dredging