塔克拉玛干沙漠公路的流沙灾害与治理

时间:2023-04-28 09:03:41 天文地理论文 我要投稿
  • 相关推荐

塔克拉玛干沙漠公路的流沙灾害与治理

Reputed as a wonderful achievement of the word's highway construction history, theTaklimakan Desert highway is now facing serious sand drift encroachment problems due to its 447-km-long passage of sand sea consisting of crescent dunes, barchan chains, compound transverse duneridges and complex megadunes. To solve some technical problems in the protection of the highwayfrom sand drift encroachment, desert experts have been conducting the theoretical and applied studieson sand movement laws; causes, severities and time-space differentiation of sand drift damages; andcontrol ways including mechanical, chemical and biological measures. In this paper the authors givean overall summary on the research contents and recent progress in the control of sand drift damagesin China and hold that the theoretical research results and practices in the prevention of sand driftencroachment on the cross-desert highway represent a breakthrough and has an epoch-makingsignificance. Since the construction of protective forest along the cross-desert highway requires largeamount of ground water, what will be its environmental consequence and whether it can effectivelyhalt sand drift encroachment on the highway forever are the questions to be studied urgently.

塔克拉玛干沙漠公路的流沙灾害与治理

作 者: 韩致文 王涛 孙庆伟 DONG Zhibao WANG Xunming HAN Zhiwen WANG Tao SUN Qingwei DONG Zhibao WANG Xunming   作者单位: Laboratory of Blown Sand Physics and Desert Environment, Cold and Arid Regions Environmental and Engineering Research Institute, CAS, Lanzhou 730000, China  刊 名: 地理学报(英文版)  ISTIC SCI 英文刊名: JOURNAL OF GEOGRAPHICAL SCIENCES  年,卷(期): 2003 13(1)  分类号: P931.3 X43  关键词: Taklimakan Desert   cross-desert highway   blown sand hazards   control technique  

【塔克拉玛干沙漠公路的流沙灾害与治理】相关文章:

穿行在塔克拉玛干沙漠04-26

浅谈复合沙障治理流沙技术04-26

塔克拉玛干沙漠腹地的长波辐射变化特征04-27

地质灾害治理方案08-14

论土地沙漠化治理04-26

塔克拉玛干沙漠北缘土壤种子库特征及动态04-26

流沙的作文12-12

沙漠公路驾驶员心理、生理特性初探04-26

沙漠公路驾驶员心理、生理特性初探04-26

清代山西灾害治理及现实意义初探04-26