Design and implementation of the det

时间:2023-04-28 11:34:06 数理化学论文 我要投稿
  • 相关推荐

Design and implementation of the detector control system for the BESⅢ drift chamber cosmic ray test

After the construction of the BESⅢ drift chamber,a long period of cosmic rays test is necessary to verify its performance.This also provides a good opportunity to integrate the detector readout electronics and Detector Control System (DCS) into a unified working system.The goal of the DCS is to guarantee reliable physics data quality and the safe operation of the detector.It monitors and controls the HV,gas,VME crates and the environmental variables.The upper-level system is mainly developed from LabVIEW and the lower-level system mainly uses MCU and PLC technology.The system is designed to be highly flexible and scalable so that it can be applied to other detectors with little or no change.In the immediate future,it will be integrated into the entire BESⅢ Slow Control System.

作 者: CHEN Xi-Hui XIE Xiao-Xi LI Xiao-Nan GAO Cui-Shan ZHANG Yin-Hong NIE Zhen-Dong MIN Jian XIE Yi-GANG   作者单位: CHEN Xi-Hui(Institute of High Energy Physics,CAS,Beijing 100049,China;Graduate University of Chinese Academy of Sciences,Beijing 100049,China)

XIE Xiao-Xi,LI Xiao-Nan,GAO Cui-Shan,ZHANG Yin-Hong,NIE Zhen-Dong,MIN Jian,XIE Yi-GANG(Institute of High Energy Physics,CAS,Beijing 100049,China) 

刊 名: 中国物理C(英文版)  ISTIC 英文刊名: CHINESE PHYSICS C  年,卷(期): 2008 32(8)  分类号: O4  关键词: Detector Control System   drift chamber   LabVIEW  

【Design and implementation of the det】相关文章:

Knowledge Fusion Design Method: Satellite Module Layout04-26

英文求职信-Design / Creative - Production Artist04-26

Ivar asteroid rendezvous mission system scenario and trajectory design04-26

Optimum municipal wastewater treatment plant design with consideration of uncertainty04-26

英文求职信-Design / Creative - Senior Graphic Designer04-26

Design of Neural Network Variable Structure Reentry Control System for Reusable Launch Vehicle04-26

Integration of chemical product development, process design and operation based on a kilo-plant04-26

A Quasi-equipotential Field Simulation for Preform Design of P/M Superalloy Disk04-26

Comparison of seismic actions and structural design requirements in Chinese Code GB 50011 and International Standard ISO04-27

新目标九年级英语第十三单元教案示例Section B Teaching Design04-25